• High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
  • High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
  • High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
  • High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
  • High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
  • High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine

High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine

Product Line: 2
Lines: 2
Voltage: 380V
Seals Mode: Heating Sealing
Speed: High
Continuous-Rolled: Yes
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
HSWX-450X2
Sealing & Cutting
Heat-Sealing Cold-Cutting
Layer
8 Layers
Machine Type
Bag Forming Machine
Computerized
Computerized
Type
Plastic Bag Making Machine
Transport Package
Wooden Pallet
Specification
L7500xW3000xH1900mm
Trademark
High Sea
Origin
Made in China
HS Code
84778
Production Capacity
500 Sets/Year

Product Description

high speed 2 lines plastic rubbish biodegradable bag without core making machine
HSWX-450X2 
Two Line Fully Automatic Garbage Bag Making Machine With V fold

High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
 
Application

These machines are heat sealing and heat cutting bag making machine, which are suit for printing and non-printing bag making. The material of bag is HDPE, LDPE.

HSWX-450X2 can make garbage bags in efficient production by automatically changing plastic rolls. The rewinder rolls are tight and in order.

This machine is folding first, then sealing and perforation in the last. Star sealing bag on roll coreless. 

 
 
TECHNICAL PARAMETER
Model HSWX-450X2
 Bag Width 200-420mm
Rewinder Roll Width 150mm - 300 mm
Bag Length 200mm - 1500 mm
Film thickness 10-35µm per layer
Production Speed 150-220pcs/min*2 Lines
Set Line Speed 80-100m/min
Film Unwind Diameter Max. Φ900mm
Total Power 14KW
Air consumption 6HP
Machine Weight 3800KG
Machine Dimension L7500*W3000*H1900mm
 
Samples of Plastic Bag

High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
SPECIFICS

High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine



High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine

 
Cooperation Brand
High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
The condition of machine operating
A. illumination no exceed 3000LX
B. altitude no exceed 1000m
C. The temperature of stuff around the machine should be no higher than
+40ºC and no lower than -20ºC.
D. The relative humidity of air no exceeds 85%.
E. The place should no have conductive dust.
F. Circumstance of no blast danger and fire.


 
Company Brief Introduction
Wenzhou High Sea Machinery CO.,LTD is founded in 1996 (Formerly known as Jinfeng plastic packaging machinery factory). For more than 22 years, we focus on researching, developing, manufacturing and marketing on plastic bag making machine. Our  products include :

1.Plastic T-shirt Bag Making Machine
2.Vegetable Bag on Roll Making Machine With Core
3.Garbage Bag Making Machine Coreless
4.Draw Tape Garbage Bag on Roll Making Machine
5.Soft Loop Handle Bag Making Machine

There are more than 54 countries and regions cooperating with us, such as south Korea,
Turkey, Malaysia, Russia,Iran, Ethiopia, Chile, Saudi Arabia, Peru, Algeria
,Vietnam,etc.
 
Work Shop

High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
 
Exhibition 

High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine

 
Other Products

High Speed 2 Lines Plastic Rubbish Biodegradable Bag Without Core Making Machine
FAQ
1.Q: How long will your engineer reach our factory?

  A: Within 7-15 days after machine arrival your factory.
2. Q: How many days will you finish installing ?

    A: We will finish installation and training within 3-7 days.
3. Q: What should we charge for your engineer?

    A: You should charge for the cost of our engineer's visa , round trip tickets, accommandation, and also their salary 100USD one day per person.
4. Q: How long is your machine's warranty period?

    A: All our machine have one year guarantee, starting from finished installation.
5. Q: How could we do after one year warranty period?

    A: We also can do service for you, but you need pay salary for my technician 100USD/day.
6. Q: How could we do if the parts broken within warranty?

    A:We would express the free replacement parts during the warranty date.
 7. Q: Does your engineer understand English?

    A:Our engineer understand a little English. All of our engineers have more than five years machine installation experience. 
8. Q: How many worker do we need running those machines?

      A: Usually need one person to opertate the machine.
9. Q: How do we solve the machine problem after your engineer leaving?

    A: Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according your description.
10. Q: How can I visit your company?
     
     A : It takes 50 minutes by car from Wenzhou Air Port to our factory .
         And it takes only 10 minutes by car from Ruian train station to High Sea factory .
 
Contact Person
Name: Milly
Mob: +8618875826722
Web:wzhsjx.en.made-in-china.com
 

TEL: 0577-63773388     
FAX
:0577-63773366

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
38
Year of Establishment
2011-02-12